Chicago, IL · Issued Aug 24, 2026

PERMIT – EXPRESS PERMIT PROGRAM in Community Area 22

SCOPE: NONSTRUCTURAL INTERIOR ALTERATION OF EXISTING DUNKIN', REPLACEMENT OF FINISHES, ELECTRICAL AND PLUMBING (AREA OF WORK 450 SQ FT). LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), INTERIOR REMODEL OF EXISTING DUNKIN.

ACTIVE — INSPECTIONSLast checked Jul 20, 2026

Permit facts

Issuing authority
Chicago Department of Buildings
Permit number
B200481402
Source type
PERMIT – EXPRESS PERMIT PROGRAM · Nonstructural Interior Work
Reported value
$95,210Reported cost supplied by applicant
Location shown
Community Area 22jurisdiction precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

SCOPE: NONSTRUCTURAL INTERIOR ALTERATION OF EXISTING DUNKIN', REPLACEMENT OF FINISHES, ELECTRICAL AND PLUMBING (AREA OF WORK 450 SQ FT). LOCATIONS: 0 RESIDENTIAL UNIT(S), 1 NON-RESIDENTIAL UNIT(S), INTERIOR REMODEL OF EXISTING DUNKIN.

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Electrical and solar

The source type or description explicitly includes “electrical.”

Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidence
Direct match

Plumbing and water systems

The source type or description explicitly includes “plumbing.”

Rule plumbing-water:direct:plumbing · taxonomy 2026.07.1 · 96% confidence
Direct match

Remodeling and interior

The source type or description explicitly includes “remodel.”

Rule remodeling-interior:direct:remodel · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Commercial tenant improvement

This project includes “remodel,” which can create downstream demand; it is not a direct tenant improvement permit.

Rule commercial-tenant-improvement:adjacent:remodel · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

HVAC and mechanical

This project includes “remodel,” which can create downstream demand; it is not a direct hvac permit.

Rule hvac-mechanical:adjacent:remodel · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

New construction and additions

This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.

Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Aug 4, 2026 · reported
  2. Issued Aug 24, 2026 · reported
  3. Ingested and normalized Aug 29, 2026 · normalized