Chicago, IL · Issued Sep 23, 2026

PERMIT – EXPRESS PERMIT PROGRAM in Community Area 8

SCOPE: NONSTRUCTURAL INTERIOR REPLACEMENT OF FINISHES AT KITCHEN AND BATHROOM, NEW PLUMBING FIXTURES AND ELECTRICAL THROUGHOUT, RECONFIGURATION OF KITCHEN AND CLOSET WITH REMOVAL OF KITCHEN ISLAND.LOCATIONS: 1 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), UNIT 301 - 3RD FLR.

ACTIVE — INSPECTIONSLast checked Jul 20, 2026

Permit facts

Issuing authority
Chicago Department of Buildings
Permit number
B200508708
Source type
PERMIT – EXPRESS PERMIT PROGRAM · Nonstructural Interior Work
Reported value
$25,000Reported cost supplied by applicant
Location shown
Community Area 8jurisdiction precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

SCOPE: NONSTRUCTURAL INTERIOR REPLACEMENT OF FINISHES AT KITCHEN AND BATHROOM, NEW PLUMBING FIXTURES AND ELECTRICAL THROUGHOUT, RECONFIGURATION OF KITCHEN AND CLOSET WITH REMOVAL OF KITCHEN ISLAND.LOCATIONS: 1 RESIDENTIAL UNIT(S), 0 NON-RESIDENTIAL UNIT(S), UNIT 301 - 3RD FLR.

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Electrical and solar

The source type or description explicitly includes “electrical.”

Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidence
Direct match

Plumbing and water systems

The source type or description explicitly includes “plumbing.”

Rule plumbing-water:direct:plumbing · taxonomy 2026.07.1 · 96% confidence
Direct match

Remodeling and interior

The source type or description explicitly includes “interior.”

Rule remodeling-interior:direct:interior · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

New construction and additions

This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.

Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Aug 26, 2026 · reported
  2. Issued Sep 23, 2026 · reported
  3. Ingested and normalized Sep 25, 2026 · normalized