Chicago, IL · Issued Oct 7, 2026

PERMIT – EXPRESS PERMIT PROGRAM in Community Area 3

LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 3 . LIGHTING OUTLETS: 2. SPECIFIC LOCATION: INSIDE STORE-REMODEL.

ACTIVE — INSPECTION ELIGIBLELast checked Jul 20, 2026

Permit facts

Issuing authority
Chicago Department of Buildings
Permit number
B200514487
Source type
PERMIT – EXPRESS PERMIT PROGRAM · Electrical Work
Reported value
$1,000Reported cost supplied by applicant
Location shown
Community Area 3jurisdiction precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

LINE VOLTAGE ELECTRICAL WORK. REPAIR OR ALTER DEVICES ON EXISTING CIRCUITS. RECEPTACLE OUTLETS: 3 . LIGHTING OUTLETS: 2. SPECIFIC LOCATION: INSIDE STORE-REMODEL.

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Electrical and solar

The source type or description explicitly includes “electrical.”

Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidence
Direct match

Remodeling and interior

The source type or description explicitly includes “remodel.”

Rule remodeling-interior:direct:remodel · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Commercial tenant improvement

This project includes “remodel,” which can create downstream demand; it is not a direct tenant improvement permit.

Rule commercial-tenant-improvement:adjacent:remodel · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

HVAC and mechanical

This project includes “remodel,” which can create downstream demand; it is not a direct hvac permit.

Rule hvac-mechanical:adjacent:remodel · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Plumbing and water systems

This project includes “remodel,” which can create downstream demand; it is not a direct plumbing permit.

Rule plumbing-water:adjacent:remodel · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Oct 5, 2026 · reported
  2. Issued Oct 7, 2026 · reported
  3. Ingested and normalized Oct 10, 2026 · normalized