Electrical and solar
The source type or description explicitly includes “electrical.”
Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidenceSELF CERT 2019 CBC: FIELD REVISIONS TO EXISTING PERMIT #101075380LAYOUTS ADJUSTED TO ALLOW STRUCTURAL BRACED WALLS ACROSS ALL LEVELS. ELECTRICAL AND MECHANICAL PLANS HAVE BEEN UPDATED ACCORDINGLY. WALL TYPES HAVE BEEN UPDATED PER STRUCTURAL PLANS. LOT DIMENSIONS CORRECTED PER SURVEY. ELECTRICAL LOAD CALC ADDED AND WATER SERVICE SIZE ADJUSTED.
SELF CERT 2019 CBC: FIELD REVISIONS TO EXISTING PERMIT #101075380LAYOUTS ADJUSTED TO ALLOW STRUCTURAL BRACED WALLS ACROSS ALL LEVELS. ELECTRICAL AND MECHANICAL PLANS HAVE BEEN UPDATED ACCORDINGLY. WALL TYPES HAVE BEEN UPDATED PER STRUCTURAL PLANS. LOT DIMENSIONS CORRECTED PER SURVEY. ELECTRICAL LOAD CALC ADDED AND WATER SERVICE SIZE ADJUSTED.
PermitProspect may normalize casing and whitespace, but does not add scope to the source description.
The source type or description explicitly includes “electrical.”
Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidenceThe source type or description explicitly includes “mechanical.”
Rule hvac-mechanical:direct:mechanical · taxonomy 2026.07.1 · 96% confidenceThe source type or description explicitly includes “new construction.”
Rule new-construction-additions:direct:new-construction · taxonomy 2026.07.1 · 96% confidence