New construction and additions
The source type or description explicitly includes “new construction.”
Rule new-construction-additions:direct:new-construction · taxonomy 2026.07.1 · 96% confidencePERMIT EXPIRES ON 10/24/2026 ERECTION STARTS: 8/25/2026, ERECTION ENDS: 9/12/2025. ARC FEST 2026- SMALL TENTSTENTS- SELF-CERT- 4 DAY EVENT SEPTEMBER 4-7, 2026ERECT ELEVEN (11) STRUCTURES- ONE (1) 10X160 FRAME, TWO (2) 20X20 FRAME, FOUR (4) 20X40 FRAME, ONE (1) 20X60 FRAME, TWO (2) 20X80 FRAME, ONE (1) 40X50 (12MX15M) STRUCTURE.SETUP 8/25/2026 ¿ REMOVE 9/12/2026ASSEMBLY
PERMIT EXPIRES ON 10/24/2026 ERECTION STARTS: 8/25/2026, ERECTION ENDS: 9/12/2025. ARC FEST 2026- SMALL TENTSTENTS- SELF-CERT- 4 DAY EVENT SEPTEMBER 4-7, 2026ERECT ELEVEN (11) STRUCTURES- ONE (1) 10X160 FRAME, TWO (2) 20X20 FRAME, FOUR (4) 20X40 FRAME, ONE (1) 20X60 FRAME, TWO (2) 20X80 FRAME, ONE (1) 40X50 (12MX15M) STRUCTURE.SETUP 8/25/2026 ¿ REMOVE 9/12/2026ASSEMBLY
PermitProspect may normalize casing and whitespace, but does not add scope to the source description.
The source type or description explicitly includes “new construction.”
Rule new-construction-additions:direct:new-construction · taxonomy 2026.07.1 · 96% confidence