New construction and additions
The source type or description explicitly includes “new construction.”
Rule new-construction-additions:direct:new-construction · taxonomy 2026.07.1 · 96% confidencePERMIT EXPIRES ON 10/27/2026 ERECTION STARTS: 9/17/2026, ERECTION ENDS: 9/18/2026. CBC 2019. AHA HEART WALK 2026 MOBILE STAGE AT SOLDIER FIELD SOUTH LOT ON SEPT 18, 2026. SETUP SEPT 17 AND TAKEDOWN SEPT 18, 2026. 1-24X20 MOBILE STAGE. RAVENSWOOD EVENTS WITH HRP CHICAGO.
PERMIT EXPIRES ON 10/27/2026 ERECTION STARTS: 9/17/2026, ERECTION ENDS: 9/18/2026. CBC 2019. AHA HEART WALK 2026 MOBILE STAGE AT SOLDIER FIELD SOUTH LOT ON SEPT 18, 2026. SETUP SEPT 17 AND TAKEDOWN SEPT 18, 2026. 1-24X20 MOBILE STAGE. RAVENSWOOD EVENTS WITH HRP CHICAGO.
PermitProspect may normalize casing and whitespace, but does not add scope to the source description.
The source type or description explicitly includes “new construction.”
Rule new-construction-additions:direct:new-construction · taxonomy 2026.07.1 · 96% confidence