New construction and additions
The source type or description explicitly includes “new construction.”
Rule new-construction-additions:direct:new-construction · taxonomy 2026.07.1 · 96% confidencePERMIT EXPIRES ON 11/03/2026 ERECTION STARTS: 9/17/2026, ERECTION ENDS: 9/21/2026. SELF CERT CBC2019 - REINSTATEMENT OF 2023 PERMIT 101030724 FOR THE 2026 CHICAGO LIVE STAGE AT NAVY PIER EAST END ON SEPT 19-20. SETUP IS SEPT 17 AND TAKEDOWN IS SEPT 21, 2026. SAME 1-SL320 40X40 MOBILE STAGE W WINGS. NAVY PIER INC WITH TECHNOTRIX INC.
PERMIT EXPIRES ON 11/03/2026 ERECTION STARTS: 9/17/2026, ERECTION ENDS: 9/21/2026. SELF CERT CBC2019 - REINSTATEMENT OF 2023 PERMIT 101030724 FOR THE 2026 CHICAGO LIVE STAGE AT NAVY PIER EAST END ON SEPT 19-20. SETUP IS SEPT 17 AND TAKEDOWN IS SEPT 21, 2026. SAME 1-SL320 40X40 MOBILE STAGE W WINGS. NAVY PIER INC WITH TECHNOTRIX INC.
PermitProspect may normalize casing and whitespace, but does not add scope to the source description.
The source type or description explicitly includes “new construction.”
Rule new-construction-additions:direct:new-construction · taxonomy 2026.07.1 · 96% confidence