Chicago, IL · Issued Aug 21, 2026

PERMIT - RENOVATION/ALTERATION in Community Area 28

DDS 2019 CBC. REVISION TO PERMIT #101075067 TO UPDATE THE FOLLOWING: REVISE TO REMOVE ROOFTOP PARK, ADD CURB CUT ON MADISON ST, REVISED PARKING LAYOUT AT LEVEL 1., ADD PARKING GARAGE ELEVATOR VESTIBULE ON EAST SIDE, REVISE ELEVATOR CORE SIZE AND LOCATIONS, REVISE LAYOUT OF TRASH AND RECYCLE ROOMS, REMOVE WEDGE BARRIERS AT TOP OF UC LOADING RAMP, REVISE STORMWATER STRATEGY, UPDATES TO PLUMBING, REVISIONS TO ELECT. AND TECH ROOM LAYOUTS, ADJUSTMENTS TO LANDSCAPE DESIGN. MIXED-USE COMMERCIAL BUILDING ADDITION TO UNITED CENTER AND WILL INCLUDE PARKING, STORAGE, COMMERCIAL LOADING AND RETAIL. THIS PROJECT IS A HIGH-RISE. OCCUPANCY GROUPS A-2, A-3, A-4, B, S-1, AND S-2. TYPE 1-A CONSTRUCTION. CONSULTANT REVIEWER: V3 COMPANIES

ACTIVE — INSPECTIONS (CERTIFICATE OF OCCUPANCY REQUIRED)Last checked Jul 20, 2026

Permit facts

Issuing authority
Chicago Department of Buildings
Permit number
101082958
Source type
PERMIT - RENOVATION/ALTERATION
Reported value
$800,000Reported cost supplied by applicant
Location shown
Community Area 28jurisdiction precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

DDS 2019 CBC. REVISION TO PERMIT #101075067 TO UPDATE THE FOLLOWING: REVISE TO REMOVE ROOFTOP PARK, ADD CURB CUT ON MADISON ST, REVISED PARKING LAYOUT AT LEVEL 1., ADD PARKING GARAGE ELEVATOR VESTIBULE ON EAST SIDE, REVISE ELEVATOR CORE SIZE AND LOCATIONS, REVISE LAYOUT OF TRASH AND RECYCLE ROOMS, REMOVE WEDGE BARRIERS AT TOP OF UC LOADING RAMP, REVISE STORMWATER STRATEGY, UPDATES TO PLUMBING, REVISIONS TO ELECT. AND TECH ROOM LAYOUTS, ADJUSTMENTS TO LANDSCAPE DESIGN. MIXED-USE COMMERCIAL BUILDING ADDITION TO UNITED CENTER AND WILL INCLUDE PARKING, STORAGE, COMMERCIAL LOADING AND RETAIL. THIS PROJECT IS A HIGH-RISE. OCCUPANCY GROUPS A-2, A-3, A-4, B, S-1, AND S-2. TYPE 1-A CONSTRUCTION. CONSULTANT REVIEWER: V3 COMPANIES

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Landscaping, irrigation, and tree work

The source type or description explicitly includes “landscape.”

Rule landscaping-tree:direct:landscape · taxonomy 2026.07.1 · 96% confidence
Direct match

Remodeling and interior

The source type or description explicitly includes “renovation.”

Rule remodeling-interior:direct:renovation · taxonomy 2026.07.1 · 96% confidence
Direct match

Roofing and exterior

The source type or description explicitly includes “roof.”

Rule roofing-exterior:direct:roof · taxonomy 2026.07.1 · 96% confidence
Direct match

New construction and additions

The source type or description explicitly includes “addition.”

Rule new-construction-additions:direct:addition · taxonomy 2026.07.1 · 96% confidence
Direct match

Plumbing and water systems

The source type or description explicitly includes “plumbing.”

Rule plumbing-water:direct:plumbing · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Windows, doors, siding, and insulation

This project includes “addition,” which can create downstream demand; it is not a direct openings & insulation permit.

Rule windows-doors-siding:adjacent:addition · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Electrical and solar

This project includes “addition,” which can create downstream demand; it is not a direct electrical & solar permit.

Rule electrical-solar:adjacent:addition · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Pools, decks, fences, and outdoor living

This project includes “addition,” which can create downstream demand; it is not a direct outdoor living permit.

Rule pools-decks-fences:adjacent:addition · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Demolition, site work, dumpsters, and hauling

This project includes “addition,” which can create downstream demand; it is not a direct demolition & hauling permit.

Rule demolition-site-hauling:adjacent:addition · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Jun 18, 2026 · reported
  2. Issued Aug 21, 2026 · reported
  3. Ingested and normalized Aug 29, 2026 · normalized