Electrical and solar
The source type or description explicitly includes “electrical.”
Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidenceSPR 2019 CBRC. BROADWAY PLAZA - NON-STRUCTURAL INTERIOR FINISH-OUT IN AN EXISTING SINGLE FLOOR UNIT INCLUDING MECHANICAL AND ELECTRICAL WORK. (OCCUPANCY: M, TYPE: IIB).
SPR 2019 CBRC. BROADWAY PLAZA - NON-STRUCTURAL INTERIOR FINISH-OUT IN AN EXISTING SINGLE FLOOR UNIT INCLUDING MECHANICAL AND ELECTRICAL WORK. (OCCUPANCY: M, TYPE: IIB).
PermitProspect may normalize casing and whitespace, but does not add scope to the source description.
The source type or description explicitly includes “electrical.”
Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidenceThe source type or description explicitly includes “mechanical.”
Rule hvac-mechanical:direct:mechanical · taxonomy 2026.07.1 · 96% confidenceThe source type or description explicitly includes “renovation.”
Rule remodeling-interior:direct:renovation · taxonomy 2026.07.1 · 96% confidenceThis project includes “structural,” which can create downstream demand; it is not a direct new construction permit.
Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidence