Electrical and solar
The source type or description explicitly includes “electrical.”
Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidenceSPR 2019 CBRC. INTERIOR ALTERATIONS TO THE EXISTING 3 STORY 12 DWELLING UNIT TYPE IIIA MASONRY BUILDING, TO CONVERT IT TO 13 DU WITH 4 NEW ADU'S IN THE BASEMENT, FOR A NEW TOTAL OF 17 DU'S. WORK INCLUDES PLUMBING, MECHANICAL, ELECTRICAL AND INSTALLATION OF NEW WINDOWS. NO CHANGE TO F.A.R. ERECT NEW 6 FT. HIGH MASONRY TRASH ENCLOSURE. R2 OCCUPANCY CLASSIFICATION, AS PER ARCHITECTURAL PLANS.
SPR 2019 CBRC. INTERIOR ALTERATIONS TO THE EXISTING 3 STORY 12 DWELLING UNIT TYPE IIIA MASONRY BUILDING, TO CONVERT IT TO 13 DU WITH 4 NEW ADU'S IN THE BASEMENT, FOR A NEW TOTAL OF 17 DU'S. WORK INCLUDES PLUMBING, MECHANICAL, ELECTRICAL AND INSTALLATION OF NEW WINDOWS. NO CHANGE TO F.A.R. ERECT NEW 6 FT. HIGH MASONRY TRASH ENCLOSURE. R2 OCCUPANCY CLASSIFICATION, AS PER ARCHITECTURAL PLANS.
PermitProspect may normalize casing and whitespace, but does not add scope to the source description.
The source type or description explicitly includes “electrical.”
Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidenceThe source type or description explicitly includes “mechanical.”
Rule hvac-mechanical:direct:mechanical · taxonomy 2026.07.1 · 96% confidenceThe source type or description explicitly includes “plumbing.”
Rule plumbing-water:direct:plumbing · taxonomy 2026.07.1 · 96% confidenceThe source type or description explicitly includes “renovation.”
Rule remodeling-interior:direct:renovation · taxonomy 2026.07.1 · 96% confidenceThe source type or description explicitly includes “window.”
Rule windows-doors-siding:direct:window · taxonomy 2026.07.1 · 96% confidence