Chicago, IL · Issued Aug 25, 2026

PERMIT - RENOVATION/ALTERATION in Community Area 32

SELF CERT 2019 CBRC: INTERIOR ALTERATIONS TO THE PHILIPPINE CONSULATE SUITE 1500 ON THE 15TH FLOOR. WORK INCLUDES DEMO, NEW PARTITIONS, FINISHES, MECHANICAL, ELECTRICAL, AND PLUMBING AS PER PLANS, NO STRUCTURAL WORK. NO CHANGE IN USE. B-BUSINESS AND CONSTRUCTION TYPE 1A

ACTIVE — PERMIT ISSUED (FEE DUE)Last checked Jul 20, 2026

Permit facts

Issuing authority
Chicago Department of Buildings
Permit number
101085476
Source type
PERMIT - RENOVATION/ALTERATION
Reported value
$300,000Reported cost supplied by applicant
Location shown
Community Area 32jurisdiction precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

SELF CERT 2019 CBRC: INTERIOR ALTERATIONS TO THE PHILIPPINE CONSULATE SUITE 1500 ON THE 15TH FLOOR. WORK INCLUDES DEMO, NEW PARTITIONS, FINISHES, MECHANICAL, ELECTRICAL, AND PLUMBING AS PER PLANS, NO STRUCTURAL WORK. NO CHANGE IN USE. B-BUSINESS AND CONSTRUCTION TYPE 1A

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Electrical and solar

The source type or description explicitly includes “electrical.”

Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidence
Direct match

HVAC and mechanical

The source type or description explicitly includes “mechanical.”

Rule hvac-mechanical:direct:mechanical · taxonomy 2026.07.1 · 96% confidence
Direct match

Plumbing and water systems

The source type or description explicitly includes “plumbing.”

Rule plumbing-water:direct:plumbing · taxonomy 2026.07.1 · 96% confidence
Direct match

Remodeling and interior

The source type or description explicitly includes “renovation.”

Rule remodeling-interior:direct:renovation · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

New construction and additions

This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.

Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Jul 20, 2026 · reported
  2. Issued Aug 25, 2026 · reported
  3. Ingested and normalized Aug 29, 2026 · normalized