Chicago, IL · Issued Sep 23, 2026

PERMIT - RENOVATION/ALTERATION in Community Area 12

2019 CBC INTERIOR REMODELING OF TWO SECOND -FLOOR BATHROOMS AND ONE BASEMENT BATHROOM, INCLUDING OVERHEAD SEWER INSTALLATIONAS AT EXISTING 2 STORY SFR PER PLAN. NO MECHANICAL WORK.

ACTIVE — INSPECTIONSLast checked Jul 20, 2026

Permit facts

Issuing authority
Chicago Department of Buildings
Permit number
101087520
Source type
PERMIT - RENOVATION/ALTERATION
Reported value
$20,000Reported cost supplied by applicant
Location shown
Community Area 12jurisdiction precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

2019 CBC INTERIOR REMODELING OF TWO SECOND -FLOOR BATHROOMS AND ONE BASEMENT BATHROOM, INCLUDING OVERHEAD SEWER INSTALLATIONAS AT EXISTING 2 STORY SFR PER PLAN. NO MECHANICAL WORK.

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

HVAC and mechanical

The source type or description explicitly includes “mechanical.”

Rule hvac-mechanical:direct:mechanical · taxonomy 2026.07.1 · 96% confidence
Direct match

Plumbing and water systems

The source type or description explicitly includes “sewer.”

Rule plumbing-water:direct:sewer · taxonomy 2026.07.1 · 96% confidence
Direct match

Remodeling and interior

The source type or description explicitly includes “remodel.”

Rule remodeling-interior:direct:remodel · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Commercial tenant improvement

This project includes “remodel,” which can create downstream demand; it is not a direct tenant improvement permit.

Rule commercial-tenant-improvement:adjacent:remodel · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Electrical and solar

This project includes “remodel,” which can create downstream demand; it is not a direct electrical & solar permit.

Rule electrical-solar:adjacent:remodel · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Aug 21, 2026 · reported
  2. Issued Sep 23, 2026 · reported
  3. Ingested and normalized Sep 25, 2026 · normalized