Demolition, site work, dumpsters, and hauling
The source type or description explicitly includes “excavation.”
Rule demolition-site-hauling:direct:excavation · taxonomy 2026.07.1 · 96% confidencePROPOSED UNDERPINNING FOUNDATION WORK AS PER PLAN FILED IN CONJUNCTION WITH DOB JOB #B01099647-i1 AND FILED WITH SUPPORT OF EXCAVATION JOB #B01232444 .
PROPOSED UNDERPINNING FOUNDATION WORK AS PER PLAN FILED IN CONJUNCTION WITH DOB JOB #B01099647-i1 AND FILED WITH SUPPORT OF EXCAVATION JOB #B01232444 .
PermitProspect may normalize casing and whitespace, but does not add scope to the source description.
The source type or description explicitly includes “excavation.”
Rule demolition-site-hauling:direct:excavation · taxonomy 2026.07.1 · 96% confidenceThis project includes “foundation,” which can create downstream demand; it is not a direct new construction permit.
Rule new-construction-additions:adjacent:foundation · taxonomy 2026.07.1 · 68% confidence