Electrical and solar
The source type or description explicitly includes “electrical.”
Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidenceALTERATION APPLICATION FOR INTERIOR RENOVATION, INCLUDING THREE-FIXTURE BASEMENT BATHROOM PER BB 2011-010, FIRST-FLOOR KITCHEN AND POWDER ROOM RENOVATIONS, AND SECOND-FLOOR WINDOW, HVAC, AND ELECTRICAL IMPROVEMENTS. NO CHANGE IN USE, OCCUPANCY, OR BULK.
ALTERATION APPLICATION FOR INTERIOR RENOVATION, INCLUDING THREE-FIXTURE BASEMENT BATHROOM PER BB 2011-010, FIRST-FLOOR KITCHEN AND POWDER ROOM RENOVATIONS, AND SECOND-FLOOR WINDOW, HVAC, AND ELECTRICAL IMPROVEMENTS. NO CHANGE IN USE, OCCUPANCY, OR BULK.
PermitProspect may normalize casing and whitespace, but does not add scope to the source description.
The source type or description explicitly includes “electrical.”
Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidenceThe source type or description explicitly includes “hvac.”
Rule hvac-mechanical:direct:hvac · taxonomy 2026.07.1 · 96% confidenceThe source type or description explicitly includes “renovation.”
Rule remodeling-interior:direct:renovation · taxonomy 2026.07.1 · 96% confidenceThe source type or description explicitly includes “window.”
Rule windows-doors-siding:direct:window · taxonomy 2026.07.1 · 96% confidenceThis project includes “general construction,” which can create downstream demand; it is not a direct tenant improvement permit.
Rule commercial-tenant-improvement:adjacent:general-construction · taxonomy 2026.07.1 · 68% confidenceThis project includes “bathroom,” which can create downstream demand; it is not a direct plumbing permit.
Rule plumbing-water:adjacent:bathroom · taxonomy 2026.07.1 · 68% confidence