New York, NY · Issued Aug 21, 2026

General Construction in Harlem (North), ZIP 10030

INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOORS AND WINDOWS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.

Permit IssuedLast checked Jul 20, 2026

Permit facts

Issuing authority
New York City Department of Buildings
Permit number
M00883180-I1-GC
Source type
General Construction · Renewal Permit Without Changes
Reported value
$1,235,652Estimated job cost as reported
Location shown
Harlem (North), ZIP 10030zip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

INTERIOR RENOVATION OF 5-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: DIRECT REPLACEMENT OF FINISHES THROUGHOUT, DIRECT REPLACEMENT OF KITCHEN, BATHROOM, DOORS AND WINDOWS. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Remodeling and interior

The source type or description explicitly includes “renovation.”

Rule remodeling-interior:direct:renovation · taxonomy 2026.07.1 · 96% confidence
Direct match

Windows, doors, siding, and insulation

The source type or description explicitly includes “window.”

Rule windows-doors-siding:direct:window · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Commercial tenant improvement

This project includes “general construction,” which can create downstream demand; it is not a direct tenant improvement permit.

Rule commercial-tenant-improvement:adjacent:general-construction · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Plumbing and water systems

This project includes “bathroom,” which can create downstream demand; it is not a direct plumbing permit.

Rule plumbing-water:adjacent:bathroom · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Mar 21, 2024 · reported
  2. Issued Aug 21, 2026 · reported
  3. Source expiration date Dec 1, 2026 · reported
  4. Ingested and normalized Aug 29, 2026 · normalized