New York, NY · Issued Nov 17, 2026

General Construction in Washington Heights (North), ZIP 10033

INTERIOR RENOVATION WITH PARTITION WORKS TO INSTALL 3 NEW BEDROOMS WITH BATHROOM, POWDER ROOM, LIVING ROOM AND KITCHENETTE, INSTALL ONE NEW AND REPLACE ONE EXISTING WINDOWS FOR 5TH FLOOR APT. 5D. NO CHANGE OF USE, EGRESS OR OCCUPANCY.

Permit IssuedLast checked Jul 20, 2026

Permit facts

Issuing authority
New York City Department of Buildings
Permit number
M01469101-I1-GC
Source type
General Construction · Initial Permit
Reported value
$91,300Estimated job cost as reported
Location shown
Washington Heights (North), ZIP 10033zip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

INTERIOR RENOVATION WITH PARTITION WORKS TO INSTALL 3 NEW BEDROOMS WITH BATHROOM, POWDER ROOM, LIVING ROOM AND KITCHENETTE, INSTALL ONE NEW AND REPLACE ONE EXISTING WINDOWS FOR 5TH FLOOR APT. 5D. NO CHANGE OF USE, EGRESS OR OCCUPANCY.

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Remodeling and interior

The source type or description explicitly includes “renovation.”

Rule remodeling-interior:direct:renovation · taxonomy 2026.07.1 · 96% confidence
Direct match

Windows, doors, siding, and insulation

The source type or description explicitly includes “window.”

Rule windows-doors-siding:direct:window · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Commercial tenant improvement

This project includes “general construction,” which can create downstream demand; it is not a direct tenant improvement permit.

Rule commercial-tenant-improvement:adjacent:general-construction · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Plumbing and water systems

This project includes “bathroom,” which can create downstream demand; it is not a direct plumbing permit.

Rule plumbing-water:adjacent:bathroom · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Nov 10, 2026 · reported
  2. Issued Nov 17, 2026 · reported
  3. Source expiration date Sep 1, 2027 · reported
  4. Ingested and normalized Nov 19, 2026 · normalized