New York, NY · Issued Aug 25, 2026

General Construction in Chelsea-Hudson Yards, ZIP 10011

Existing 19 Story building proposed slab openings on 3rd floor through lower roof. proposed work consists of installing steel columns, steel beams, steel frames, composite steel deck and reinforcement of existing building, structure.

Permit IssuedLast checked Jul 20, 2026

Permit facts

Issuing authority
New York City Department of Buildings
Permit number
M01342113-I1-GC-CX
Source type
General Construction · Renewal Permit with Changes
Reported value
$10,000Estimated job cost as reported
Location shown
Chelsea-Hudson Yards, ZIP 10011zip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

Existing 19 Story building proposed slab openings on 3rd floor through lower roof. proposed work consists of installing steel columns, steel beams, steel frames, composite steel deck and reinforcement of existing building, structure.

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Pools, decks, fences, and outdoor living

The source type or description explicitly includes “deck.”

Rule pools-decks-fences:direct:deck · taxonomy 2026.07.1 · 96% confidence
Direct match

Roofing and exterior

The source type or description explicitly includes “roof.”

Rule roofing-exterior:direct:roof · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Commercial tenant improvement

This project includes “general construction,” which can create downstream demand; it is not a direct tenant improvement permit.

Rule commercial-tenant-improvement:adjacent:general-construction · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Remodeling and interior

This project includes “general construction,” which can create downstream demand; it is not a direct remodeling permit.

Rule remodeling-interior:adjacent:general-construction · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Jan 22, 2026 · reported
  2. Issued Aug 25, 2026 · reported
  3. Source expiration date Nov 8, 2026 · reported
  4. Ingested and normalized Aug 29, 2026 · normalized