New York, NY · Issued Sep 29, 2026

General Construction in Windsor Terrace-South Slope, ZIP 11215

PARTIAL DEMOLITION ON EXISTING ONE(1) FAMILY,TWO (2) STORY FRAME RESIDENTIAL BUILDING WITH BASEMENT AND CELLAR.NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.

Permit IssuedLast checked Jul 20, 2026

Permit facts

Issuing authority
New York City Department of Buildings
Permit number
B01465874-I1-GC
Source type
General Construction · Initial Permit
Reported value
$67,600Estimated job cost as reported
Location shown
Windsor Terrace-South Slope, ZIP 11215zip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

PARTIAL DEMOLITION ON EXISTING ONE(1) FAMILY,TWO (2) STORY FRAME RESIDENTIAL BUILDING WITH BASEMENT AND CELLAR.NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY.

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Demolition, site work, dumpsters, and hauling

The source type or description explicitly includes “demolition.”

Rule demolition-site-hauling:direct:demolition · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Commercial tenant improvement

This project includes “general construction,” which can create downstream demand; it is not a direct tenant improvement permit.

Rule commercial-tenant-improvement:adjacent:general-construction · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Landscaping, irrigation, and tree work

This project includes “demolition,” which can create downstream demand; it is not a direct landscaping & tree permit.

Rule landscaping-tree:adjacent:demolition · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Remodeling and interior

This project includes “general construction,” which can create downstream demand; it is not a direct remodeling permit.

Rule remodeling-interior:adjacent:general-construction · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Sep 28, 2026 · reported
  2. Issued Sep 29, 2026 · reported
  3. Source expiration date May 5, 2027 · reported
  4. Ingested and normalized Oct 1, 2026 · normalized