New York, NY · Issued Aug 21, 2026

General Construction in Upper West Side-Lincoln Square, ZIP 10023

General construction for the interior demolition throughout existing eating and drinking establishment at the 1st floor and basement indicated on drawing filed herewith No change in use egress or occupancy under this application

Permit IssuedLast checked Jul 20, 2026

Permit facts

Issuing authority
New York City Department of Buildings
Permit number
M01387587-I1-GC
Source type
General Construction · Initial Permit
Reported value
$150,000Estimated job cost as reported
Location shown
Upper West Side-Lincoln Square, ZIP 10023zip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

General construction for the interior demolition throughout existing eating and drinking establishment at the 1st floor and basement indicated on drawing filed herewith No change in use egress or occupancy under this application

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Demolition, site work, dumpsters, and hauling

The source type or description explicitly includes “demolition.”

Rule demolition-site-hauling:direct:demolition · taxonomy 2026.07.1 · 96% confidence
Direct match

Remodeling and interior

The source type or description explicitly includes “interior.”

Rule remodeling-interior:direct:interior · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Commercial tenant improvement

This project includes “general construction,” which can create downstream demand; it is not a direct tenant improvement permit.

Rule commercial-tenant-improvement:adjacent:general-construction · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Landscaping, irrigation, and tree work

This project includes “demolition,” which can create downstream demand; it is not a direct landscaping & tree permit.

Rule landscaping-tree:adjacent:demolition · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Jul 28, 2026 · reported
  2. Issued Aug 21, 2026 · reported
  3. Source expiration date Nov 30, 2026 · reported
  4. Ingested and normalized Aug 29, 2026 · normalized