New York, NY · Issued Aug 25, 2026

General Construction in Morningside Heights, ZIP 10027

Selective demolition of interior finishes and partitions within an unoccupied college dormitory. No modifications to underlying structural slabs/bearing walls, nor changes to use, occupancy or egress.

Permit IssuedLast checked Jul 20, 2026

Permit facts

Issuing authority
New York City Department of Buildings
Permit number
M01268438-I1-GC
Source type
General Construction · Renewal Permit with Changes
Reported value
$616,757Estimated job cost as reported
Location shown
Morningside Heights, ZIP 10027zip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

Selective demolition of interior finishes and partitions within an unoccupied college dormitory. No modifications to underlying structural slabs/bearing walls, nor changes to use, occupancy or egress.

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Demolition, site work, dumpsters, and hauling

The source type or description explicitly includes “demolition.”

Rule demolition-site-hauling:direct:demolition · taxonomy 2026.07.1 · 96% confidence
Direct match

Remodeling and interior

The source type or description explicitly includes “interior.”

Rule remodeling-interior:direct:interior · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Commercial tenant improvement

This project includes “general construction,” which can create downstream demand; it is not a direct tenant improvement permit.

Rule commercial-tenant-improvement:adjacent:general-construction · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Landscaping, irrigation, and tree work

This project includes “demolition,” which can create downstream demand; it is not a direct landscaping & tree permit.

Rule landscaping-tree:adjacent:demolition · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

New construction and additions

This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.

Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Oct 30, 2025 · reported
  2. Issued Aug 25, 2026 · reported
  3. Source expiration date Dec 31, 2026 · reported
  4. Ingested and normalized Aug 29, 2026 · normalized