New York, NY · Issued Oct 20, 2026

General Construction in Upper East Side-Lenox Hill-Roosevelt Island, ZIP 10021

INSTALLATION (1) NEW WINDOW & ENLARGEMENT (1) EXISTING WINDOW ON EXISTING WALL SET-BACK FROM LOT LINE. THE WINDOWS ARE NOT A LOT LINE WINDOWS, PROPOSED TO BE INSTALLED ON A WALL SETBACK FROM THE LOT LINE APPROX 11'-0. NO CHANGE IN USE, EGRESS, OCCUPANCY.

Permit IssuedLast checked Jul 20, 2026

Permit facts

Issuing authority
New York City Department of Buildings
Permit number
M01382407-I1-GC
Source type
General Construction · Initial Permit
Reported value
$25,000Estimated job cost as reported
Location shown
Upper East Side-Lenox Hill-Roosevelt Island, ZIP 10021zip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

INSTALLATION (1) NEW WINDOW & ENLARGEMENT (1) EXISTING WINDOW ON EXISTING WALL SET-BACK FROM LOT LINE. THE WINDOWS ARE NOT A LOT LINE WINDOWS, PROPOSED TO BE INSTALLED ON A WALL SETBACK FROM THE LOT LINE APPROX 11'-0. NO CHANGE IN USE, EGRESS, OCCUPANCY.

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Windows, doors, siding, and insulation

The source type or description explicitly includes “window.”

Rule windows-doors-siding:direct:window · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Commercial tenant improvement

This project includes “general construction,” which can create downstream demand; it is not a direct tenant improvement permit.

Rule commercial-tenant-improvement:adjacent:general-construction · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Remodeling and interior

This project includes “general construction,” which can create downstream demand; it is not a direct remodeling permit.

Rule remodeling-interior:adjacent:general-construction · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Jul 14, 2026 · reported
  2. Issued Oct 20, 2026 · reported
  3. Source expiration date Jul 12, 2027 · reported
  4. Ingested and normalized Oct 22, 2026 · normalized