New York, NY · Issued Oct 20, 2026

General Construction in Mount Hope, ZIP 10457

AT 7th AND 8th FLOORS: INTERIOR REMOVAL OF NON-LOADBEARING PARTITIONS, CEILINGS, FLOORING, AND FINISHES.REMOVAL ALL PLUMBING, ELECTRICAL AND HVAC EQUIPMENT. NO CHANGE IN OCCUPANCY OR EGRESS.

Permit IssuedLast checked Jul 20, 2026

Permit facts

Issuing authority
New York City Department of Buildings
Permit number
X01038302-S1-GC
Source type
General Construction · Renewal Permit Without Changes
Reported value
$65,000Estimated job cost as reported
Location shown
Mount Hope, ZIP 10457zip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

AT 7th AND 8th FLOORS: INTERIOR REMOVAL OF NON-LOADBEARING PARTITIONS, CEILINGS, FLOORING, AND FINISHES.REMOVAL ALL PLUMBING, ELECTRICAL AND HVAC EQUIPMENT. NO CHANGE IN OCCUPANCY OR EGRESS.

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Electrical and solar

The source type or description explicitly includes “electrical.”

Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidence
Direct match

HVAC and mechanical

The source type or description explicitly includes “hvac.”

Rule hvac-mechanical:direct:hvac · taxonomy 2026.07.1 · 96% confidence
Direct match

Plumbing and water systems

The source type or description explicitly includes “plumbing.”

Rule plumbing-water:direct:plumbing · taxonomy 2026.07.1 · 96% confidence
Direct match

Remodeling and interior

The source type or description explicitly includes “interior.”

Rule remodeling-interior:direct:interior · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Commercial tenant improvement

This project includes “general construction,” which can create downstream demand; it is not a direct tenant improvement permit.

Rule commercial-tenant-improvement:adjacent:general-construction · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Oct 22, 2024 · reported
  2. Issued Oct 20, 2026 · reported
  3. Source expiration date Nov 30, 2026 · reported
  4. Ingested and normalized Oct 22, 2026 · normalized