Demolition, site work, dumpsters, and hauling
The source type or description explicitly includes “demolition.”
Rule demolition-site-hauling:direct:demolition · taxonomy 2026.07.1 · 96% confidenceIN DUPLEX UNIT 9A, ON 8TH AND 9TH FLOORS, DEMOLITION AND INSTALLING OF NON-LOADBEARING PARTITIONS AND LIGHTING AS SHOWN IN PLANS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
IN DUPLEX UNIT 9A, ON 8TH AND 9TH FLOORS, DEMOLITION AND INSTALLING OF NON-LOADBEARING PARTITIONS AND LIGHTING AS SHOWN IN PLANS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
PermitProspect may normalize casing and whitespace, but does not add scope to the source description.
The source type or description explicitly includes “demolition.”
Rule demolition-site-hauling:direct:demolition · taxonomy 2026.07.1 · 96% confidenceThe source type or description explicitly includes “lighting.”
Rule electrical-solar:direct:lighting · taxonomy 2026.07.1 · 96% confidenceThis project includes “general construction,” which can create downstream demand; it is not a direct tenant improvement permit.
Rule commercial-tenant-improvement:adjacent:general-construction · taxonomy 2026.07.1 · 68% confidenceThis project includes “demolition,” which can create downstream demand; it is not a direct landscaping & tree permit.
Rule landscaping-tree:adjacent:demolition · taxonomy 2026.07.1 · 68% confidenceThis project includes “general construction,” which can create downstream demand; it is not a direct remodeling permit.
Rule remodeling-interior:adjacent:general-construction · taxonomy 2026.07.1 · 68% confidence