New York, NY · Issued Aug 27, 2026

General Construction in Oakwood-Richmondtown, ZIP 10306

Filing herewith: Basement FLR - New resinous floor for Polymer Storage area; FLR 001 - Intumescent paint under ELEC control room; Roof - Partial Removal and Replacement of Roofing on Main Building. No Change in use or occupancy. No major change in egress.

Permit IssuedLast checked Jul 20, 2026

Permit facts

Issuing authority
New York City Department of Buildings
Permit number
S08021838-Z3-GC
Source type
General Construction · Renewal Permit Without Changes
Reported value
$4,000,105Estimated job cost as reported
Location shown
Oakwood-Richmondtown, ZIP 10306zip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

Filing herewith: Basement FLR - New resinous floor for Polymer Storage area; FLR 001 - Intumescent paint under ELEC control room; Roof - Partial Removal and Replacement of Roofing on Main Building. No Change in use or occupancy. No major change in egress.

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Roofing and exterior

The source type or description explicitly includes “roof.”

Rule roofing-exterior:direct:roof · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Commercial tenant improvement

This project includes “general construction,” which can create downstream demand; it is not a direct tenant improvement permit.

Rule commercial-tenant-improvement:adjacent:general-construction · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Remodeling and interior

This project includes “general construction,” which can create downstream demand; it is not a direct remodeling permit.

Rule remodeling-interior:adjacent:general-construction · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Jul 5, 2023 · reported
  2. Issued Aug 27, 2026 · reported
  3. Source expiration date Dec 31, 2026 · reported
  4. Ingested and normalized Aug 30, 2026 · normalized