New York, NY · Issued Aug 26, 2026

General Construction in Carroll Gardens-Cobble Hill-Gowanus-Red Hook, ZIP 11201

PROPOSED INT. RENOVATION OF BSMT LOBBY. RECONSTRUCTION OF NON-LOAD BEARING INT. PARTITIONS, CEILING & FLOOR FINISHES. REPLACEMENT OF ENTRY DOORS & VESTIBULE. INSTALLATION OF STRUCT. SLAB IN PART OF ELECTRICAL.NO CHANGE TO BUILDING BULK,EGRESS, USE, OR OCC

Permit IssuedLast checked Jul 20, 2026

Permit facts

Issuing authority
New York City Department of Buildings
Permit number
B00580847-I1-GC
Source type
General Construction · Renewal Permit Without Changes
Reported value
$64,500Estimated job cost as reported
Location shown
Carroll Gardens-Cobble Hill-Gowanus-Red Hook, ZIP 11201zip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

PROPOSED INT. RENOVATION OF BSMT LOBBY. RECONSTRUCTION OF NON-LOAD BEARING INT. PARTITIONS, CEILING & FLOOR FINISHES. REPLACEMENT OF ENTRY DOORS & VESTIBULE. INSTALLATION OF STRUCT. SLAB IN PART OF ELECTRICAL.NO CHANGE TO BUILDING BULK,EGRESS, USE, OR OCC

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Electrical and solar

The source type or description explicitly includes “electrical.”

Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidence
Direct match

Remodeling and interior

The source type or description explicitly includes “renovation.”

Rule remodeling-interior:direct:renovation · taxonomy 2026.07.1 · 96% confidence
Direct match

Windows, doors, siding, and insulation

The source type or description explicitly includes “door.”

Rule windows-doors-siding:direct:door · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Commercial tenant improvement

This project includes “general construction,” which can create downstream demand; it is not a direct tenant improvement permit.

Rule commercial-tenant-improvement:adjacent:general-construction · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Mar 24, 2022 · reported
  2. Issued Aug 26, 2026 · reported
  3. Source expiration date Oct 31, 2026 · reported
  4. Ingested and normalized Aug 29, 2026 · normalized