New York, NY · Issued Aug 24, 2026

General Construction in Bath Beach, ZIP 11214

FILE TO OBTAIN C OF O FOR THIS BUILDING,FOR 1ST FL RETAIL STORE, 2ND FL -1 DWELLING, AND 3RD FL- 1 DWELLING.PROPOSE MINER PLUMBING WORK AND ELECTRICAL WORK BE FILED SEPARATELY. THIS BUILDING IS OCCUPIED NOW AS 3 3-STORY COM. BLDG BASED ON L.O.N 15288

Permit IssuedLast checked Jul 20, 2026

Permit facts

Issuing authority
New York City Department of Buildings
Permit number
B01343306-I1-GC
Source type
General Construction · Initial Permit
Reported value
$224,200Estimated job cost as reported
Location shown
Bath Beach, ZIP 11214zip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

FILE TO OBTAIN C OF O FOR THIS BUILDING,FOR 1ST FL RETAIL STORE, 2ND FL -1 DWELLING, AND 3RD FL- 1 DWELLING.PROPOSE MINER PLUMBING WORK AND ELECTRICAL WORK BE FILED SEPARATELY. THIS BUILDING IS OCCUPIED NOW AS 3 3-STORY COM. BLDG BASED ON L.O.N 15288

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Electrical and solar

The source type or description explicitly includes “electrical.”

Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidence
Direct match

Plumbing and water systems

The source type or description explicitly includes “plumbing.”

Rule plumbing-water:direct:plumbing · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Commercial tenant improvement

This project includes “general construction,” which can create downstream demand; it is not a direct tenant improvement permit.

Rule commercial-tenant-improvement:adjacent:general-construction · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Remodeling and interior

This project includes “general construction,” which can create downstream demand; it is not a direct remodeling permit.

Rule remodeling-interior:adjacent:general-construction · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Jun 24, 2026 · reported
  2. Issued Aug 24, 2026 · reported
  3. Source expiration date Nov 9, 2026 · reported
  4. Ingested and normalized Aug 29, 2026 · normalized