New York, NY · Issued Oct 19, 2026

Plumbing in Astoria (East)-Woodside (North), ZIP 11377

SUBSEQUENT ALTERATION APPLICATION FOR INTERIORRENOVATION, INCLUDING THREE-FIXTUREBASEMENT BATHROOM PER BB 2011-010,FIRST-FLOOR KITCHEN AND POWDER ROOMRENOVATIONS, AND SECOND-FLOOR WINDOW,HVAC, AND ELECTRICAL IMPROVEMENTS. NOCHANGE IN USE, OCCUPANCY,

Permit IssuedLast checked Jul 20, 2026

Permit facts

Issuing authority
New York City Department of Buildings
Permit number
Q01458596-S1-PL
Source type
Plumbing · Initial Permit
Reported value
$0Estimated job cost as reported
Location shown
Astoria (East)-Woodside (North), ZIP 11377zip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

SUBSEQUENT ALTERATION APPLICATION FOR INTERIORRENOVATION, INCLUDING THREE-FIXTUREBASEMENT BATHROOM PER BB 2011-010,FIRST-FLOOR KITCHEN AND POWDER ROOMRENOVATIONS, AND SECOND-FLOOR WINDOW,HVAC, AND ELECTRICAL IMPROVEMENTS. NOCHANGE IN USE, OCCUPANCY,

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Electrical and solar

The source type or description explicitly includes “electrical.”

Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidence
Direct match

HVAC and mechanical

The source type or description explicitly includes “hvac.”

Rule hvac-mechanical:direct:hvac · taxonomy 2026.07.1 · 96% confidence
Direct match

Plumbing and water systems

The source type or description explicitly includes “plumbing.”

Rule plumbing-water:direct:plumbing · taxonomy 2026.07.1 · 96% confidence
Direct match

Remodeling and interior

The source type or description explicitly includes “renovation.”

Rule remodeling-interior:direct:renovation · taxonomy 2026.07.1 · 96% confidence
Direct match

Windows, doors, siding, and insulation

The source type or description explicitly includes “window.”

Rule windows-doors-siding:direct:window · taxonomy 2026.07.1 · 96% confidence
Reported chronology

Permit timeline

  1. Filed or applied Oct 15, 2026 · reported
  2. Issued Oct 19, 2026 · reported
  3. Source expiration date Jun 30, 2027 · reported
  4. Ingested and normalized Oct 21, 2026 · normalized