New York, NY · Issued Aug 24, 2026

Plumbing in Todt Hill-Emerson Hill-Lighthouse Hill-Manor Heights, ZIP 10314

INSTALL (13) FIXTURES ON NEW REAR ADDITION. REMOVE EXISTING HWH TANK. INSTALL (2) NEW TANKLESS HWH COIL, (2) YARD DRAINS, (2) DRYWELLS

Permit IssuedLast checked Jul 20, 2026

Permit facts

Issuing authority
New York City Department of Buildings
Permit number
S01248829-S1-PL
Source type
Plumbing · Initial Permit
Reported value
$83,000Estimated job cost as reported
Location shown
Todt Hill-Emerson Hill-Lighthouse Hill-Manor Heights, ZIP 10314zip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

INSTALL (13) FIXTURES ON NEW REAR ADDITION. REMOVE EXISTING HWH TANK. INSTALL (2) NEW TANKLESS HWH COIL, (2) YARD DRAINS, (2) DRYWELLS

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Plumbing and water systems

The source type or description explicitly includes “plumbing.”

Rule plumbing-water:direct:plumbing · taxonomy 2026.07.1 · 96% confidence
Direct match

New construction and additions

The source type or description explicitly includes “addition.”

Rule new-construction-additions:direct:addition · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Landscaping, irrigation, and tree work

This project includes “addition,” which can create downstream demand; it is not a direct landscaping & tree permit.

Rule landscaping-tree:adjacent:addition · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Pools, decks, fences, and outdoor living

This project includes “addition,” which can create downstream demand; it is not a direct outdoor living permit.

Rule pools-decks-fences:adjacent:addition · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Roofing and exterior

This project includes “addition,” which can create downstream demand; it is not a direct roofing permit.

Rule roofing-exterior:adjacent:addition · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Demolition, site work, dumpsters, and hauling

This project includes “addition,” which can create downstream demand; it is not a direct demolition & hauling permit.

Rule demolition-site-hauling:adjacent:addition · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Windows, doors, siding, and insulation

This project includes “addition,” which can create downstream demand; it is not a direct openings & insulation permit.

Rule windows-doors-siding:adjacent:addition · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Electrical and solar

This project includes “addition,” which can create downstream demand; it is not a direct electrical & solar permit.

Rule electrical-solar:adjacent:addition · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Aug 8, 2025 · reported
  2. Issued Aug 24, 2026 · reported
  3. Source expiration date Feb 1, 2027 · reported
  4. Ingested and normalized Aug 29, 2026 · normalized