New York, NY · Issued Aug 26, 2026

Protection and Mechanical Methods in Midtown-Times Square, ZIP 10001

INSTALLATION OF ELEVATED ROOF PROTECTION FOR ADJACENT PROPERTY PROTECTION DURING NEW BUILDING CONSTRUCTION, ELEVATED ROOF PROTECTION IS DESIGNED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.

Permit IssuedLast checked Jul 20, 2026

Permit facts

Issuing authority
New York City Department of Buildings
Permit number
M00598933-I1-PM
Source type
Protection and Mechanical Methods · Renewal Permit Without Changes
Reported value
$1,000Estimated job cost as reported
Location shown
Midtown-Times Square, ZIP 10001zip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

INSTALLATION OF ELEVATED ROOF PROTECTION FOR ADJACENT PROPERTY PROTECTION DURING NEW BUILDING CONSTRUCTION, ELEVATED ROOF PROTECTION IS DESIGNED IN ACCORDANCE WITH NYCC 2014 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

New construction and additions

The source type or description explicitly includes “new building.”

Rule new-construction-additions:direct:new-building · taxonomy 2026.07.1 · 96% confidence
Direct match

HVAC and mechanical

The source type or description explicitly includes “mechanical.”

Rule hvac-mechanical:direct:mechanical · taxonomy 2026.07.1 · 96% confidence
Direct match

Roofing and exterior

The source type or description explicitly includes “roof.”

Rule roofing-exterior:direct:roof · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Demolition, site work, dumpsters, and hauling

This project includes “new building,” which can create downstream demand; it is not a direct demolition & hauling permit.

Rule demolition-site-hauling:adjacent:new-building · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Plumbing and water systems

This project includes “new building,” which can create downstream demand; it is not a direct plumbing permit.

Rule plumbing-water:adjacent:new-building · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Landscaping, irrigation, and tree work

This project includes “new building,” which can create downstream demand; it is not a direct landscaping & tree permit.

Rule landscaping-tree:adjacent:new-building · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Electrical and solar

This project includes “new building,” which can create downstream demand; it is not a direct electrical & solar permit.

Rule electrical-solar:adjacent:new-building · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Fire protection and security systems

This project includes “new building,” which can create downstream demand; it is not a direct fire & security permit.

Rule fire-security:adjacent:new-building · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Sep 23, 2021 · reported
  2. Issued Aug 26, 2026 · reported
  3. Source expiration date Nov 16, 2026 · reported
  4. Ingested and normalized Aug 29, 2026 · normalized