New construction and additions
This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.
Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidenceNYCHA BOILER_BLDG#5_Replace existing boilers with Con-Ed PRV Station, replace heat exchangers, connect heat recovery system to exist. instantaneous hot water heating in exist. boiler room and coal bunker, and construct new mezzanine for PRV Station.
NYCHA BOILER_BLDG#5_Replace existing boilers with Con-Ed PRV Station, replace heat exchangers, connect heat recovery system to exist. instantaneous hot water heating in exist. boiler room and coal bunker, and construct new mezzanine for PRV Station.
PermitProspect may normalize casing and whitespace, but does not add scope to the source description.
This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.
Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidence