New construction and additions
This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.
Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidenceINSTALLATION OF SHORING FOR COLUMN 62 AND COLUMN 63 BETWEEN FLOOR 21 AND FLOOR 22. INSTALLATION OF SEAT CATCH SYSTEM ON COLUMN 57 AND COLUMN 58 ON MULTIPLE FLOORS. CUT AND REMOVE COLUMN 62 AND COLUMN 63 ON FLOOR 21. INSTALLATION OF JACKING ASSEMBLIES IN P
INSTALLATION OF SHORING FOR COLUMN 62 AND COLUMN 63 BETWEEN FLOOR 21 AND FLOOR 22. INSTALLATION OF SEAT CATCH SYSTEM ON COLUMN 57 AND COLUMN 58 ON MULTIPLE FLOORS. CUT AND REMOVE COLUMN 62 AND COLUMN 63 ON FLOOR 21. INSTALLATION OF JACKING ASSEMBLIES IN P
PermitProspect may normalize casing and whitespace, but does not add scope to the source description.
This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.
Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidence