New construction and additions
This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.
Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidenceArchitectural/Structural modifications taking place on the 1st floor (lobby exterior) as per plans filed herewith. No change in use, egress or occupancy.
Architectural/Structural modifications taking place on the 1st floor (lobby exterior) as per plans filed herewith. No change in use, egress or occupancy.
PermitProspect may normalize casing and whitespace, but does not add scope to the source description.
This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.
Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidence