New York, NY · Issued Sep 1, 2026

Structural in Crown Heights (South), ZIP 11225

PROPOSED STRUCTURAL SCOPE OF WORK OF MEDGAR EVERS COLLEGE PHASE 2- (AHU) AIR HANDLING REPLACEMENT OF EXISTING WINDOWS, WINDOWS FRAMES, REPAIR INTERIOR ELEMENTS.

Permit IssuedLast checked Jul 20, 2026

Permit facts

Issuing authority
New York City Department of Buildings
Permit number
B08018297-S3-ST
Source type
Structural · Renewal Permit Without Changes
Reported value
$75,036Estimated job cost as reported
Location shown
Crown Heights (South), ZIP 11225zip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

PROPOSED STRUCTURAL SCOPE OF WORK OF MEDGAR EVERS COLLEGE PHASE 2- (AHU) AIR HANDLING REPLACEMENT OF EXISTING WINDOWS, WINDOWS FRAMES, REPAIR INTERIOR ELEMENTS.

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Remodeling and interior

The source type or description explicitly includes “interior.”

Rule remodeling-interior:direct:interior · taxonomy 2026.07.1 · 96% confidence
Direct match

Windows, doors, siding, and insulation

The source type or description explicitly includes “window.”

Rule windows-doors-siding:direct:window · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

New construction and additions

This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.

Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Nov 7, 2022 · reported
  2. Issued Sep 1, 2026 · reported
  3. Source expiration date Apr 30, 2027 · reported
  4. Ingested and normalized Sep 3, 2026 · normalized