New construction and additions
This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.
Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidenceRemove and reconstruct parapets. Reuse existing face brick to the greatest extent possible. All replacement face brick to match existing in all respects. No change in egress, zoning, use, or occupancy.
Remove and reconstruct parapets. Reuse existing face brick to the greatest extent possible. All replacement face brick to match existing in all respects. No change in egress, zoning, use, or occupancy.
PermitProspect may normalize casing and whitespace, but does not add scope to the source description.
This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.
Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidence