New construction and additions
This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.
Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidenceStructural modifications: Recessing two bays of slab at the 1st Floor to accommodate a stair and an ADA ramp on the 1st Floor as per plans (Hines - Storefront Phase 2.) No change to use, egress or occupancy.
Structural modifications: Recessing two bays of slab at the 1st Floor to accommodate a stair and an ADA ramp on the 1st Floor as per plans (Hines - Storefront Phase 2.) No change to use, egress or occupancy.
PermitProspect may normalize casing and whitespace, but does not add scope to the source description.
This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.
Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidence