New construction and additions
This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.
Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidenceTemporary bracing & shoring of rear building wall &tie to existing building frame through all floors and rebuild of same rear wall in kind from basement to 2nd floor. All work as necessary & plans submitted. No change in use, occupancy or egress.
Temporary bracing & shoring of rear building wall &tie to existing building frame through all floors and rebuild of same rear wall in kind from basement to 2nd floor. All work as necessary & plans submitted. No change in use, occupancy or egress.
PermitProspect may normalize casing and whitespace, but does not add scope to the source description.
This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.
Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidence