New York, NY · Issued Aug 31, 2026

Structural in Upper West Side (Central), ZIP 10024

THE STRUCTURAL SCOPE OF WORK INCLUDES ADDITION OF NEW STEEL BEAMS AND POSTS TO ACCOMMODATE THE ENLARGED OPENING AT THE FIRST FLOOR,DESIGN OF THE STAIR STRINGERS, AND INFILL OF AN EXISTING OPENING AT THE FIRST FLOOR

Permit IssuedLast checked Jul 20, 2026

Permit facts

Issuing authority
New York City Department of Buildings
Permit number
M01418985-S1-ST
Source type
Structural · Initial Permit
Reported value
$18,500Estimated job cost as reported
Location shown
Upper West Side (Central), ZIP 10024zip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

THE STRUCTURAL SCOPE OF WORK INCLUDES ADDITION OF NEW STEEL BEAMS AND POSTS TO ACCOMMODATE THE ENLARGED OPENING AT THE FIRST FLOOR,DESIGN OF THE STAIR STRINGERS, AND INFILL OF AN EXISTING OPENING AT THE FIRST FLOOR

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

New construction and additions

The source type or description explicitly includes “addition.”

Rule new-construction-additions:direct:addition · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Electrical and solar

This project includes “addition,” which can create downstream demand; it is not a direct electrical & solar permit.

Rule electrical-solar:adjacent:addition · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Landscaping, irrigation, and tree work

This project includes “addition,” which can create downstream demand; it is not a direct landscaping & tree permit.

Rule landscaping-tree:adjacent:addition · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Demolition, site work, dumpsters, and hauling

This project includes “addition,” which can create downstream demand; it is not a direct demolition & hauling permit.

Rule demolition-site-hauling:adjacent:addition · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Pools, decks, fences, and outdoor living

This project includes “addition,” which can create downstream demand; it is not a direct outdoor living permit.

Rule pools-decks-fences:adjacent:addition · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Roofing and exterior

This project includes “addition,” which can create downstream demand; it is not a direct roofing permit.

Rule roofing-exterior:adjacent:addition · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Windows, doors, siding, and insulation

This project includes “addition,” which can create downstream demand; it is not a direct openings & insulation permit.

Rule windows-doors-siding:adjacent:addition · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Aug 11, 2026 · reported
  2. Issued Aug 31, 2026 · reported
  3. Source expiration date Oct 31, 2026 · reported
  4. Ingested and normalized Sep 2, 2026 · normalized