New construction and additions
This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.
Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidenceHUB ACCEPTED- Exterior Installation of temporary structure for 90 days, Temp Structure to be removed after duration for LOC issuance no change in use, egress or occupancy
HUB ACCEPTED- Exterior Installation of temporary structure for 90 days, Temp Structure to be removed after duration for LOC issuance no change in use, egress or occupancy
PermitProspect may normalize casing and whitespace, but does not add scope to the source description.
This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.
Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidence