New construction and additions
This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.
Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidenceStructural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy.
Structural modifications to the BNY Lobby Level (1st Floor) and related structural scope on Cellar, and Floors 1-22 and 25, as per plans. No change to use, egress, or occupancy.
PermitProspect may normalize casing and whitespace, but does not add scope to the source description.
This project includes “structural,” which can create downstream demand; it is not a direct new construction permit.
Rule new-construction-additions:adjacent:structural · taxonomy 2026.07.1 · 68% confidence