Demolition, site work, dumpsters, and hauling
The source type or description explicitly includes “excavation.”
Rule demolition-site-hauling:direct:excavation · taxonomy 2026.07.1 · 96% confidenceHEREWITH FILING SOE PLANS OF PROP. 6 STORY NEW BLDG. THE SOE INVOLVES INSTALLATION OF SOLDIER BEAMS & TIMBER LAGGING AND 1:1 EXCAVATION. THIS JOB IS FILED IN CONJUNCTION WITH DOB JOB # B01114441-I1
HEREWITH FILING SOE PLANS OF PROP. 6 STORY NEW BLDG. THE SOE INVOLVES INSTALLATION OF SOLDIER BEAMS & TIMBER LAGGING AND 1:1 EXCAVATION. THIS JOB IS FILED IN CONJUNCTION WITH DOB JOB # B01114441-I1
PermitProspect may normalize casing and whitespace, but does not add scope to the source description.
The source type or description explicitly includes “excavation.”
Rule demolition-site-hauling:direct:excavation · taxonomy 2026.07.1 · 96% confidence