Demolition, site work, dumpsters, and hauling
The source type or description explicitly includes “excavation.”
Rule demolition-site-hauling:direct:excavation · taxonomy 2026.07.1 · 96% confidenceProposed support of excavation work for new 4-sty building with bulkhead and cellar, vertical and horizontal enlargement from the existing 2-story building. Filed in conjunction with Alt-1 job #B01099647 & foundation job #B01232085.
Proposed support of excavation work for new 4-sty building with bulkhead and cellar, vertical and horizontal enlargement from the existing 2-story building. Filed in conjunction with Alt-1 job #B01099647 & foundation job #B01232085.
PermitProspect may normalize casing and whitespace, but does not add scope to the source description.
The source type or description explicitly includes “excavation.”
Rule demolition-site-hauling:direct:excavation · taxonomy 2026.07.1 · 96% confidenceThis project includes “foundation,” which can create downstream demand; it is not a direct new construction permit.
Rule new-construction-additions:adjacent:foundation · taxonomy 2026.07.1 · 68% confidence