New York, NY · Issued Jul 2, 2026

Supported Scaffold in Bedford-Stuyvesant (West), ZIP 11205

INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING WORK. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.

Permit IssuedLast checked Jul 20, 2026

Permit facts

Issuing authority
New York City Department of Buildings
Permit number
B01357908-I1-SH
Source type
Supported Scaffold · Renewal Permit Without Changes
Reported value
$5,000Estimated job cost as reported
Location shown
Bedford-Stuyvesant (West), ZIP 11205zip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING WORK. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

New construction and additions

The source type or description explicitly includes “new building.”

Rule new-construction-additions:direct:new-building · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Electrical and solar

This project includes “new building,” which can create downstream demand; it is not a direct electrical & solar permit.

Rule electrical-solar:adjacent:new-building · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Fire protection and security systems

This project includes “new building,” which can create downstream demand; it is not a direct fire & security permit.

Rule fire-security:adjacent:new-building · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

HVAC and mechanical

This project includes “new building,” which can create downstream demand; it is not a direct hvac permit.

Rule hvac-mechanical:adjacent:new-building · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Landscaping, irrigation, and tree work

This project includes “new building,” which can create downstream demand; it is not a direct landscaping & tree permit.

Rule landscaping-tree:adjacent:new-building · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Plumbing and water systems

This project includes “new building,” which can create downstream demand; it is not a direct plumbing permit.

Rule plumbing-water:adjacent:new-building · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Demolition, site work, dumpsters, and hauling

This project includes “new building,” which can create downstream demand; it is not a direct demolition & hauling permit.

Rule demolition-site-hauling:adjacent:new-building · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Roofing and exterior

This project includes “new building,” which can create downstream demand; it is not a direct roofing permit.

Rule roofing-exterior:adjacent:new-building · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Feb 17, 2026 · reported
  2. Issued Jul 2, 2026 · reported
  3. Source expiration date Sep 30, 2026 · reported
  4. Ingested and normalized Aug 29, 2026 · normalized