Austin, TX · Issued Aug 20, 2026

Building Permit in ZIP 78701 area

Tenant Finish Out -Divide Floor 10 into 7 Spec Suites

ActiveLast checked Jul 20, 2026

Permit facts

Issuing authority
Austin Development Services
Permit number
2026-104537 BP
Source type
Building Permit · C-1001 Commercial Finish Out · Remodel
Reported value
$0Applicable source valuation as reported
Location shown
ZIP 78701 areazip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

Tenant Finish Out -Divide Floor 10 into 7 Spec Suites

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Commercial tenant improvement

The source type or description explicitly includes “commercial finish out.”

Rule commercial-tenant-improvement:direct:commercial-finish-out · taxonomy 2026.07.1 · 96% confidence
Direct match

Remodeling and interior

The source type or description explicitly includes “remodel.”

Rule remodeling-interior:direct:remodel · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Electrical and solar

This project includes “remodel,” which can create downstream demand; it is not a direct electrical & solar permit.

Rule electrical-solar:adjacent:remodel · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Fire protection and security systems

This project includes “commercial finish out,” which can create downstream demand; it is not a direct fire & security permit.

Rule fire-security:adjacent:commercial-finish-out · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

HVAC and mechanical

This project includes “remodel,” which can create downstream demand; it is not a direct hvac permit.

Rule hvac-mechanical:adjacent:remodel · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Plumbing and water systems

This project includes “remodel,” which can create downstream demand; it is not a direct plumbing permit.

Rule plumbing-water:adjacent:remodel · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Jul 8, 2026 · reported
  2. Issued Aug 20, 2026 · reported
  3. Source expiration date Feb 17, 2027 · reported
  4. Ingested and normalized Aug 29, 2026 · normalized