Austin, TX · Issued Oct 19, 2026

Electrical Permit in ZIP 78744 area

*Green Building* New 2-story 5 bedroom 4 bathroom single family residence with attached garage covered front porch and rear covered patio. Revision 1: Changed roof pitch to 5:12. Changed all side and rear to stucco. Changed stone rowlock to stucco cap. Lowered porch towner and expanded front porch footprint.

ActiveLast checked Jul 20, 2026

Permit facts

Issuing authority
Austin Development Services
Permit number
2026-055094 EP
Source type
Electrical Permit · R- 101 Single Family Houses · New
Reported value
$0Applicable source valuation as reported
Location shown
ZIP 78744 areazip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

*Green Building* New 2-story 5 bedroom 4 bathroom single family residence with attached garage covered front porch and rear covered patio. Revision 1: Changed roof pitch to 5:12. Changed all side and rear to stucco. Changed stone rowlock to stucco cap. Lowered porch towner and expanded front porch footprint.

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Electrical and solar

The source type or description explicitly includes “electrical.”

Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidence
Direct match

Pools, decks, fences, and outdoor living

The source type or description explicitly includes “patio.”

Rule pools-decks-fences:direct:patio · taxonomy 2026.07.1 · 96% confidence
Direct match

Roofing and exterior

The source type or description explicitly includes “roof.”

Rule roofing-exterior:direct:roof · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Plumbing and water systems

This project includes “bathroom,” which can create downstream demand; it is not a direct plumbing permit.

Rule plumbing-water:adjacent:bathroom · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Apr 9, 2026 · reported
  2. Issued Oct 19, 2026 · reported
  3. Source expiration date Nov 1, 2026 · reported
  4. Ingested and normalized Oct 21, 2026 · normalized