Austin, TX · Issued Aug 27, 2026

Electrical Permit in ZIP 78704 area

Transition from overhead service to underground service in order to maintain Austin energy clearance requirements for swimming pool extension. This includes running conduit underground from AE pole to inground pull box that we install then conduit from the pole box underground to the home and onto the line side of the meter. Need exact location from planning and development from Austin energy

ActiveLast checked Jul 20, 2026

Permit facts

Issuing authority
Austin Development Services
Permit number
2026-089101 EP
Source type
Electrical Permit · Residential · Repair
Reported value
$0Applicable source valuation as reported
Location shown
ZIP 78704 areazip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

Transition from overhead service to underground service in order to maintain Austin energy clearance requirements for swimming pool extension. This includes running conduit underground from AE pole to inground pull box that we install then conduit from the pole box underground to the home and onto the line side of the meter. Need exact location from planning and development from Austin energy

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Electrical and solar

The source type or description explicitly includes “electrical.”

Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidence
Direct match

Pools, decks, fences, and outdoor living

The source type or description explicitly includes “pool.”

Rule pools-decks-fences:direct:pool · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Landscaping, irrigation, and tree work

This project includes “pool,” which can create downstream demand; it is not a direct landscaping & tree permit.

Rule landscaping-tree:adjacent:pool · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Jul 10, 2026 · reported
  2. Issued Aug 27, 2026 · reported
  3. Source expiration date Feb 23, 2027 · reported
  4. Ingested and normalized Aug 29, 2026 · normalized