Austin, TX · Issued Jul 22, 2026

Electrical Permit in ZIP 78701 area

Interior Remodel of Existing Office Space with Access Control Requested - Phase 1 Phase 2 Phase 3 for Suite 1400 and Phase 1 for Suite 1500)

ActiveLast checked Jul 20, 2026

Permit facts

Issuing authority
Austin Development Services
Permit number
2026-092772 EP
Source type
Electrical Permit · C-1000 Commercial Remodel · Remodel
Reported value
$0Applicable source valuation as reported
Location shown
ZIP 78701 areazip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

Interior Remodel of Existing Office Space with Access Control Requested - Phase 1 Phase 2 Phase 3 for Suite 1400 and Phase 1 for Suite 1500)

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Fire protection and security systems

The source type or description explicitly includes “access control.”

Rule fire-security:direct:access-control · taxonomy 2026.07.1 · 96% confidence
Direct match

Pools, decks, fences, and outdoor living

The source type or description explicitly includes “spa.”

Rule pools-decks-fences:direct:spa · taxonomy 2026.07.1 · 96% confidence
Direct match

Remodeling and interior

The source type or description explicitly includes “remodel.”

Rule remodeling-interior:direct:remodel · taxonomy 2026.07.1 · 96% confidence
Direct match

Electrical and solar

The source type or description explicitly includes “electrical.”

Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

HVAC and mechanical

This project includes “remodel,” which can create downstream demand; it is not a direct hvac permit.

Rule hvac-mechanical:adjacent:remodel · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Commercial tenant improvement

This project includes “remodel,” which can create downstream demand; it is not a direct tenant improvement permit.

Rule commercial-tenant-improvement:adjacent:remodel · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

Plumbing and water systems

This project includes “remodel,” which can create downstream demand; it is not a direct plumbing permit.

Rule plumbing-water:adjacent:remodel · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Jun 3, 2026 · reported
  2. Issued Jul 22, 2026 · reported
  3. Source expiration date Feb 17, 2027 · reported
  4. Ingested and normalized Aug 29, 2026 · normalized