Austin, TX · Issued Sep 3, 2026

Electrical Permit in ZIP 78727 area

Remove existing service entrance equipment. Install new 200A main breaker panel meter socket and service entrance conductors sized per 2023 NEC. Install proper grounding electrode system (ground rods/water pipe bonding) and equipotential bonding.

ActiveLast checked Jul 20, 2026

Permit facts

Issuing authority
Austin Development Services
Permit number
2026-112471 EP
Source type
Electrical Permit · Residential · Upgrade
Reported value
$0Applicable source valuation as reported
Location shown
ZIP 78727 areazip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

Remove existing service entrance equipment. Install new 200A main breaker panel meter socket and service entrance conductors sized per 2023 NEC. Install proper grounding electrode system (ground rods/water pipe bonding) and equipotential bonding.

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Electrical and solar

The source type or description explicitly includes “electrical.”

Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidence
Reported chronology

Permit timeline

  1. Filed or applied Aug 27, 2026 · reported
  2. Issued Sep 3, 2026 · reported
  3. Source expiration date Mar 2, 2027 · reported
  4. Ingested and normalized Sep 5, 2026 · normalized