Austin, TX · Issued Aug 26, 2026

Plumbing Permit in ZIP 78759 area

Interior finish out for suite 380 demised under 2026-057381 PR and 2026-062627 BP. No work was done in 380 besides the demising wall under previous permit. It was left in a shell state. No access control scope included.

ActiveLast checked Jul 20, 2026

Permit facts

Issuing authority
Austin Development Services
Permit number
2026-095180 PP
Source type
Plumbing Permit · C-1001 Commercial Finish Out · Remodel
Reported value
$0Applicable source valuation as reported
Location shown
ZIP 78759 areazip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

Interior finish out for suite 380 demised under 2026-057381 PR and 2026-062627 BP. No work was done in 380 besides the demising wall under previous permit. It was left in a shell state. No access control scope included.

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Commercial tenant improvement

The source type or description explicitly includes “commercial finish out.”

Rule commercial-tenant-improvement:direct:commercial-finish-out · taxonomy 2026.07.1 · 96% confidence
Direct match

Fire protection and security systems

The source type or description explicitly includes “access control.”

Rule fire-security:direct:access-control · taxonomy 2026.07.1 · 96% confidence
Direct match

Plumbing and water systems

The source type or description explicitly includes “plumbing.”

Rule plumbing-water:direct:plumbing · taxonomy 2026.07.1 · 96% confidence
Direct match

Remodeling and interior

The source type or description explicitly includes “remodel.”

Rule remodeling-interior:direct:remodel · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Electrical and solar

This project includes “remodel,” which can create downstream demand; it is not a direct electrical & solar permit.

Rule electrical-solar:adjacent:remodel · taxonomy 2026.07.1 · 68% confidence
Likely adjacency

HVAC and mechanical

This project includes “interior finish out,” which can create downstream demand; it is not a direct hvac permit.

Rule hvac-mechanical:adjacent:interior-finish-out · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Jul 13, 2026 · reported
  2. Issued Aug 26, 2026 · reported
  3. Source expiration date Feb 23, 2027 · reported
  4. Ingested and normalized Aug 29, 2026 · normalized