Austin, TX · Issued Aug 25, 2026

Plumbing Permit in ZIP 78729 area

CHANGE OF USE OFFICE TO RETAIL with Demo to interior walls demo electrical in interior walls install cameras in existing locations re-route outlets and switches all plumbing and mechanical to remain polished concrete floors paint

ActiveLast checked Jul 20, 2026

Permit facts

Issuing authority
Austin Development Services
Permit number
2026-106309 PP
Source type
Plumbing Permit · C-1000 Commercial Remodel · Remodel
Reported value
$0Applicable source valuation as reported
Location shown
ZIP 78729 areazip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

CHANGE OF USE OFFICE TO RETAIL with Demo to interior walls demo electrical in interior walls install cameras in existing locations re-route outlets and switches all plumbing and mechanical to remain polished concrete floors paint

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Electrical and solar

The source type or description explicitly includes “electrical.”

Rule electrical-solar:direct:electrical · taxonomy 2026.07.1 · 96% confidence
Direct match

HVAC and mechanical

The source type or description explicitly includes “mechanical.”

Rule hvac-mechanical:direct:mechanical · taxonomy 2026.07.1 · 96% confidence
Direct match

Plumbing and water systems

The source type or description explicitly includes “plumbing.”

Rule plumbing-water:direct:plumbing · taxonomy 2026.07.1 · 96% confidence
Direct match

Remodeling and interior

The source type or description explicitly includes “remodel.”

Rule remodeling-interior:direct:remodel · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

Commercial tenant improvement

This project includes “remodel,” which can create downstream demand; it is not a direct tenant improvement permit.

Rule commercial-tenant-improvement:adjacent:remodel · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Jul 6, 2026 · reported
  2. Issued Aug 25, 2026 · reported
  3. Source expiration date Feb 16, 2027 · reported
  4. Ingested and normalized Aug 29, 2026 · normalized