Austin, TX · Issued Aug 31, 2026

Plumbing Permit in ZIP 78735 area

Repipe drain lines for 2 full bathrooms kitchen and washer under pier and beam foundation total length of drain line is approximately 40 feet and reroute drain lines to the right side of the home. Replace sewer line from the home to the city tap connection with length of approximately 60 feet.

ActiveLast checked Jul 20, 2026

Permit facts

Issuing authority
Austin Development Services
Permit number
2026-111683 PP
Source type
Plumbing Permit · Residential · Repair
Reported value
$0Applicable source valuation as reported
Location shown
ZIP 78735 areazip precision; exact coordinates suppressed
Source freshness
Jul 20, 2026Portal dataset update timestamp
Source fact

Official work description

Repipe drain lines for 2 full bathrooms kitchen and washer under pier and beam foundation total length of drain line is approximately 40 feet and reroute drain lines to the right side of the home. Replace sewer line from the home to the city tap connection with length of approximately 60 feet.

PermitProspect may normalize casing and whitespace, but does not add scope to the source description.

Explainable classification

Trade signals

Direct match

Plumbing and water systems

The source type or description explicitly includes “plumbing.”

Rule plumbing-water:direct:plumbing · taxonomy 2026.07.1 · 96% confidence
Likely adjacency

New construction and additions

This project includes “foundation,” which can create downstream demand; it is not a direct new construction permit.

Rule new-construction-additions:adjacent:foundation · taxonomy 2026.07.1 · 68% confidence
Reported chronology

Permit timeline

  1. Filed or applied Aug 26, 2026 · reported
  2. Issued Aug 31, 2026 · reported
  3. Source expiration date Feb 27, 2027 · reported
  4. Ingested and normalized Sep 2, 2026 · normalized